Environmental assessment and finding of no significant impact Boyer Chute National Wildlife Refuge, Ft. Calhoun, Nebraska.

Cover of: Environmental assessment and finding of no significant impact |

Published by U.S. Fish and Wildlife Service in Denver, Colo .

Written in English

Read online

Subjects:

  • Environmental protection -- Nebraska -- Washington County.,
  • Environmental protection -- Nebraska -- Douglas County.,
  • Wetland conservation -- Nebraska -- Washington County.,
  • Wetland conservation -- Nebraska -- Douglas County.

Edition Notes

Book details

Other titlesBoyer Chute National Wildlife Refuge.
The Physical Object
FormatMicroform
Pagination1 v. (various pagings)
ID Numbers
Open LibraryOL17676596M

Download Environmental assessment and finding of no significant impact

(e) Prepare a finding of no significant impact (§ ), if the agency determines on the basis of the environmental assessment not to prepare a statement. (1) The agency shall make the finding of no significant impact available to the affected public as specified in § Enacted by: the 91st United States Congress.

Finding of No Significant Impact After considering the environmental effects described in the EA and the effectiveness of the project design measures in this decision, it is determined that these actions will not have a significant effect on the quality of the human environment considering the context and intensity of impacts (40 CFR ).

ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT Project Title: Silver Falls State Park Recreation and Public Purposes Lease EA Number: DOI-BLM-OR-SEA Type of Project: Issuing a Recreation and Public Purposes (R&PP) Lease. Environmental Assessment and Finding of No Significant Impact Environmental Assessment Number DOI-BLM-OR-SEA May Salem District Columbia County, Oregon T.

4 N., R. 3 W. sections 7, 9, 21, Environmental assessment and finding of no significant impact book, W.M. Responsible Agency: USDI - Bureau of Land Management Responsible Official: Stephen M.

Small, Field Manager. The FAA as lead agency, has completed and is publishing the Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) and Record of Decision (ROD) for the proposed Eastgate Air Cargo Facility at San Environmental assessment and finding of no significant impact book International Airport (SBD).

Copies of this Environmental Assessment and Finding of No Significant Impact have been distributed to agencies, elected officials, organizations, and individuals who may have interest in the project.

In addition, a news release announcing these documents was issued. There have been no comments received that were averse to the proposed action. Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 kV Transmission Lines with the Henderson-Mead No.1 kV Transmission Line, Clark County, Nevada).

United States: N. p., Web. doi/   Draft Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the Proposed Tijuana River Vegetation Control Document Posting Date: J Mount Sinai South Nassau is proposing to expand health care services at our main campus in Oceanside and in Long Beach, the home of Long Island’s first and only free-standing emergency department.

Updated Supplemental Environmental Assessment. The U.S. Bureau of Reclamation (Reclamation) prepared this Finding of No Significant Impact (FONSI) to comply with the Council on Environmental Quality’s (CEQ) regulations for implementing the procedural provisions of the National Environmental Policy Act, as amended (NEPA).

ENVIRONMENTAL ASSESSMENT with Finding of No Significant Impact PECUE LANE/I INTERCHANGE EAST BATON ROUGE PARISH State Project No. H We are advising the public that an environmental assessment and finding of no significant impact has been prepared by the Animal and Plant Health Inspection Service relative to the issuance of a permit to allow the field testing of genetically engineered organisms.

The environmental assessment. This environmental assessment found the proposed action (Alternative 1) would have no significant direct.

indirect or cumulative adverse impacts on human health or the environment. As such, this proposed action does not require the completion of an environmental impact. Finding of No Significant Impact and Environmental Assessment Sonny Bono Salton Sea National Wildlife Refuge Complex Comprehensive Conservation Plan Prepared by: U.S.

Fish and Wildlife Service Pacific Southwest Region Refuge Planning Office Cottage Way, W Sacramento, CA and Sonny Bono Salton Sea Nation al Wildlife Refuge Complex. EA Environmental Assessment EFH Essential Fish Habitat EPA (U.S.) Environmental Protection Agency FONSI Finding of No Significant Impact NAAQS National Ambient Air Quality Standards NEPA National Environmental Policy Act NO x Nitrogen oxides NRCS Natural Resources Conservation Services.

A Finding of No Significant Impact (FONSI) presents the reasons why an action will not have a significant effect on the human environment. It must include the Environment Assessment(EA) or summary of the EA that supports the FONSI determination. Draft Finding of No Significant Impact.

In accordance with the National Environmental Policy Act of (NEPA), as amended, the Alaska District, U.S. Army Corps of Engineers has assessed the environmental effects of the following action.

Finding of No Significant Impact (FONSI) for. Cystorelin ® (gonadorelin) For use with cloprostenol sodium to synchronize estrous cycles to allow for fixed time artificial insemination (FTAI) in. lactating dairy cows and beef cows. Merial Inc. Duluth, GA. The Center for Veterinary Medicine (CVM) has considered the potential environmental.

Environmental Assessment and Finding of No Significant Impact Environmental Assessment DOI-BLM-OR-SEA May United States Department of the Interior Bureau of Land Management, Oregon State Office Salem District, Cascades Resource Area Clackamas County, Oregon T.

4 S., R. 5 E., Sec. 7, 18 W. Environmental Assessment 1 (EA) was prepared, and a Finding of No Significant Impact 2 was approved, for the use of SPV for efficacy field trials by the U.S. Geological Survey (USGS).

Those trials included vaccination treatments of prairie dog colonies in 7 states and included 4File Size: KB. US Environmental Assessment & Finding Of No Significant Impact The Colorado Department of Transportation (CDOT), in cooperation with the Federal Highway Administration (FHWA), prepared this Environmental Assessment (EA) of the potential environmental, social, and economic impacts of proposed improvements to US ENVIRONMENTAL ASSESSMENT, FINDING OF NO SIGNIFICANT IMPACT, and DECISION RECORD1 ENVIRONMENTAL ASSESSMENT EA Number: OR BLM Office: Tillamook Resource Area, Third Street, Tillamook, Oregon, Proposed Action Title: Cherry Grove Timber Co.

Reciprocal Right-of-Way Agreement and G. Koennecke Right-of-Way Agreement (S). Final Environmental Assessment / Finding of No Significant Impact. Statewide Programmatic General Permit and Programmatic Agreement for the restoration, repair, maintenance and reconstruction of traditional Hawaiian fishpond systems across Hawaiʻi.

October File Size: 2MB. Island School Updated Master Plan Final Environmental Assessment P-1 PREFACE This Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) is prepared pursuant to ChapterHawai‘i Revised Statutes (HRS), and Ti ChapterAdministrative Rules, Department of Health, State of Hawai‘i.

The U.S. Customs and Border Protection (CBP) announces the availability of the Final Environmental Assessment (EA) and Final Finding of No Significant Impact (FONSI) for the proposed new Niagara Area of Responsibility (AOR) Border Patrol Station (BPS).

President’s Council on Environmental Quality (40 CFR §§). The purpose of this EA is to analyze the potential environmental and social impacts of the improvements to Lake Bella Vista Dam project and to determine whether to prepare an Environmental Impact Statement (EIS) or a Finding of No Significant Impact (FONSI).

The Final Environmental Assessment was completed and DOE issued a statement known as a Finding of No Significant Impact (FONSI). The FONSI Determined that the project would not have a significant effect on the quality of the human environment and the project may proceed.

Finding of No Significant Impact (FONSI): This Environmental Assessment was conducted in accordance with the National Environmental Policy Act (NEPA) ofthe Council on Environmental Quality (CEQ) regulations, ARand various applicable environmental laws, regulations, and executive orders.

Finding of significant impact. (A) If the director determines as a result of an environmental assessment that a potentially significant adverse environmental impact may occur, unless the applicant withdraws the assistance proposal for funding consideration or modifies theFile Size: 11KB.

An environmental impact statement and environmental impact record process generally requires hazard identifications, scenario development, and a risk assessment. The risk assessment generally involves an analysis of the frequency or probability of hazards, such as oil spills, occurring, and an analysis of the consequences of these incidents.

Get this from a library. Decision notice: environmental assessment and finding of no significant impact: Tonto National Forest. [United States.

Forest Service. Southwestern Region.;]. AMC Environmental Assessment for the Relocation of the Defense Non-tactical Generator and Rail Equipment Center - September ; AMC Energetics-Contaminated Building Demolition SPEA - Signed Finding of No Significant Impact (FNSI) - February Get this from a library.

Agate Lake resource management plan, finding of no significant impact and environmental assessment. [Rogue River Basin Project, Oregon (U.S.). Talent Division.; United States. Bureau of Reclamation. Lower Columbia Area Office.; Jackson County (Or.). Roads and Parks Services.].

The signed Finding of No Significant Impact (FONSI) document is also included in the final environmental assessment document as Appendix H. The Environmental Assessment process. The National Environmental Policy Act (NEPA) was signed into law in Environmental Assessment, Final Decision Notice, and Finding of No Significant Impact.

Forest Service Finding of No Significant Impact for the Kosciusko Vegetation Management and environmental effects, relevant issues and concerns, and public comments.

My rationale isFile Size: 7MB. United States Department of Agriculture. Forest Service. March Environmental Assessment and Finding of No Significant Impact.

Pole Creek Gravel Pit Expansion. @article{osti_, title = {Billy Shaw Dam and Reservoir: Environmental Assessment and Finding of No Significant Impacts.}, author = {United States. Bonneville Power Administration and Shoshone-Paiute Tribes of the Duck Valley Reservation, Nevada.}, abstractNote = {This notice announces BPA`s decision to fund the construction, operation, and maintenance of the Billy Shaw Dam and Reservoir.

(02) Environmental Assessment / Finding Of No Significant Impact (EA/FONSI) The type of project for which the environmental document is typically considered to be an EA/FONSI is as follows.

Rock Creek Park, National Capital Park, Bicycle Trail Study and Environmental Assessment (EA) B1; Record of Decision, Finding of No Significant Impact (FONSI): Environmental Impact Statement: Contributor: United States.

National Park Service: Published: Original from: Northwestern University: Digitized: Export Citation. Re-evaluated Environmental Assessment/Finding of No Significant Impact Author: MDT Subject: Re-evaluated Environmental Assessment/Finding of No Significant.

Environmental assessments are prepared under the National Environmental Policy Act to determine whether a project requires an environmental impact statement or a finding of no significant impact.

When conducting an environmental assessment for a HUD-assisted project, refer to .Final Environmental Assessment and Finding of No Significant Impact for Alamito and Terneros Sediment and Vegetation Removal below Presidio Flood Control Project, Presidio, Texas.

1/ ( MB) Environmental Assessment for Rehabilitation of the Levee System in the Tijuana River Flood Control Project. 12/ ( MB).The Supplemental Programmatic Environmental Assessment (SPEA) for Army Force Structure Realignment and Draft Finding of No Significant Impact (FNSI) are available for review and comment.

36014 views Sunday, November 1, 2020